Solar Grid Installation Roadmap
1. Site Assessment & IoT Feasibility
Before installation, the site must be audited using the same precision Radius applies to its own “Xenius” platform.
Irradiance & Shadow Mapping: Utilizing 3D modeling to identify obstructions (HVAC units, neighboring buildings) that could impact the Performance Ratio (PR).
Structural Load Audit: Ensuring the rooftop or ground-mount site can withstand the dead load of panels and the dynamic load of wind speeds (designed for up to 150 km/h).
Grid Point of Interconnection (POI): Identifying the optimal location to sync the solar AC output with the existing LT/HT panels to minimize transmission loss.
2. Technical System Specifications
To match Radius Corp’s reputation for modern technology, the system should feature high-density components:
Bifacial TOPCon Modules: Utilizing N-type cells that offer higher efficiency (22%–25%) and lower degradation over 25 years.
Smart String Inverters: Equipped with multiple Maximum Power Point Trackers (MPPT) to handle mismatched shading and integrated with RS485/WiFi for seamless IoT data logging.
Protection Systems: * DC Side: SPD (Surge Protection Devices) and DC fuses.
AC Side: Dedicated earthing for the inverter and structure, plus lightning arrestors.
3. Smart Grid Integration (The Xenius Layer)
For a company like Radius, the installation must go beyond a standard “dumb” meter.
Net-Metering Execution: Managing the regulatory approval for bi-directional meters, allowing Radius to export surplus energy to the utility grid and receive bill credits.
Real-Time Analytics: Integrating the inverter’s API with a centralized dashboard to monitor:
Specific Yield: $kWh/kWp$ generated per day.
Self-Consumption vs. Export: Real-time visibility into how much solar power is staying in-house.
Carbon Offset Tracking: Automated reporting for ESG (Environmental, Social, and Governance) compliance.
Performance Benchmarks for Radius Corp
Parameter | Targeted Goal | Impact |
System Efficiency | > 18% (Overall) | Maximizes power from limited urban roof space. |
Annual Degradation | < 0.4% | Ensures the plant remains a high-value asset in 2040. |
O&M Uptime | > 98% | Minimized downtime through predictive AI alerts. |
Payback Period | 3.5 – 4.5 Years | Fast ROI through high-load self-consumption. |
Documentation & Site Audit
Application submission
Technical Inspection
Quality Material Procurement
Professional Panel Installation
Grid Connection & Commissioning
